|
The following is a list of permits that Delaware Township requires, plus some notes that may assist you in understanding the regulations involved.
The Fee Schedule is supplied in the Portable Document File (PDF) format and is readable with ADOBE ACROBAT (tm) reader. To get the reader free click Here!
| New House |
Sewage, Well, Zoning, Building and Road Encroachment
Note: Prior to being issued a Certificate of Occupancy, the
Building Permit will require an Electrical Certification.
Road Encroachment Permit is for Township Roads;
PennDot requires a permit for State Roads.
|
| Septic System Repair |
Sewage |
| Structural Repair |
Building |
| Addition |
Building, Zoning and Sewage (if bedroom addition) |
| Change of Use |
Zoning |
| Signs |
Zoning |
| Sheds (200 sq ft or less) |
Zoning |
|
For further details, please click on the appropriate department:
|
|
|
Should designs or plans change after a project has begun, all work on the project MUST cease. Plans showing the revision must be drawn to scale, and to the IRC 2003 Code for one and two family dwellings. Any and all additional fees must be paid. The revised plan must then be approved by the respective department(s) before any further work on the project may continue. |
|